Rising to a New Level of Access and
Hospitality:
The Next Campaign for Pilgrim

Capital
Campaign Resource Center
Click
here to see some great photos from our Elevator Dedication Ceremony on
6/1/08!
In 2004, former
senior pastor Dr.
Laurie preached a sermon that challenged the congregation to install an elevator
so that every level of our building would be fully accessible to all. Much
earlier than that, discussions had begun about refurbishing our kitchen and
Fellowship Hall.
The Trustees have been in conversation about a list of projects that might be
included in the next set of capital improvements. Most of the suggested projects
relate to access or hospitality–hallmarks of Pilgrim–as well as necessary
maintenance:
 |
Kitchen and Fellowship Hall rehab |
 |
Accessible restroom installation on main floor |
 |
Pastors’ wing remodeling |
 |
Stained glass dome restoration in sanctuary |
 |
Energy conservation measures |
 |
Masonry repair to exterior |
 |
New sign installation |
 |
Front walkways widened or replaced |
 |
Additional parking paved |
 |
A tithe to mission outreach |
Continued
|